Consulting firm · Dakar, Senegal
Wooded hills and a laterite track

Consulting firm · Dakar · Established March 2025

Reconciling environmental performance,
social equity and climate resilience.

E2CS Consult supports governments, local authorities, projects and companies in mainstreaming environmental, social and climate issues, from design through to regulatory compliance.

Wooded hills and a laterite track.

Scroll

0

years of continuous professional practice since 1995

0+

environmental and social studies and instruments delivered

0

countries of assignment and 3 transboundary river basins

0

funders and institutions behind the projects our team has worked on

01 · Who we are

Thirty years in the field,
put to work on your projects.

Born of more than thirty years of continuous practice (from protected-area conservation to the appraisal of major infrastructure projects), our approach is rigorous, inclusive and grounded in local realities.

Our work is aligned with the international safeguard standards, the World Bank Environmental and Social Framework, the AfDB Operational Safeguards, the IFC Performance Standards and IFAD’s requirements, while complying with Senegalese regulation, notably the Environment Code (Law No. 2023-15 of 2 August 2023).

Meet the firm and its founder

Reed beds and water lilies in a wetland
Reed beds and water lilies, the kind of environment our assessments must characterise before any development.

02 · Our expertise

Six ways in,
one integrated offer.

From preliminary study to construction supervision, from community engagement to climate finance and GIS mapping.

Biodiversity & ecosystem services

Natural and critical habitats, biodiversity management plans, ecological offsets and no net loss (ESS 6 / IFC PS 6).

Environmental & social assessments

ESIA, environmental impact statements, ESMF, strategic assessments, management plans, compliance audits and construction monitoring.

Resettlement & stakeholder engagement

RAP and resettlement policy frameworks, stakeholder engagement plans, grievance mechanisms, GBV/SEA-SH prevention.

Health, safety & labour

Labour Management Procedures, occupational health and safety, working conditions and community health and safety (ESS 2).

Climate & climate finance

Vulnerability analysis, adaptation and mitigation projects, access to the GCF, the GEF and the Adaptation Fund.

GIS & mapping

Thematic mapping, georeferenced data collection with KoboToolbox, remote sensing and geographic dashboards.

See also: training & capacity building

Standards we work to

We speak your funder’s language

Every deliverable is built to clear the funder’s review first time round: instruments, terminology and compliance grids aligned with the applicable framework.

ESS 1-10Environmental and Social Framework, World Bank
OS1-OS10Integrated Safeguards System, AfDB
IFC PSPerformance Standards, International Finance Corporation
SECAPSocial, Environmental and Climate Assessment Procedures, IFAD
EHSEnvironmental, Health and Safety Guidelines, World Bank Group
2023-15Senegal Environment Code & classified-installation nomenclature

Funders of the projects our team has worked on

World Bank / IDA African Development Bank European Union, EDF AFD IFAD KfW Netherlands Enterprise Agency, RVO Adaptation Fund Green Climate Fund UNCDF UNIDO Millennium Challenge Account GEF / SGP IUCN FFEM OMVS WeForest

03 · Method

A methodology with its own tools, from prospecting to close-out.

To guarantee the quality, compliance and traceability of its assignments, E2CS Consult has developed a toolkit of twelve instruments, aligned with the World Bank, AfDB and IFC frameworks.

Explore the toolkit

  1. Scope before producing

    Screening, categorisation and a scoping note: we first establish which instrument is required, and why.

  2. Go and get the data

    Georeferenced field surveys, digital collection with KoboToolbox, and documented consultations disaggregated by sex and group.

  3. Analyse and prioritise

    Impact matrix, the avoid–minimise–restore–offset mitigation hierarchy, and measures that are budgeted and assigned.

  4. Transfer and monitor

    Team training, contractor-level management plans, grievance and consultation registers, monitoring dashboards.

04 · Track record

Assignments serving
major programmes.

Agropoles, energy and mining, irrigation schemes, artisanal fisheries: assignments in Senegal and the sub-region, for the World Bank, the AfDB, IFAD and the Netherlands cooperation.

World Bank

ESIA of the Alto Bandim floating thermal power plant

Guinea-Bissau

AfDB

Stakeholder Engagement Plan, Centre Agropole (PZTA Centre)

Senegal, Diourbel, Fatick, Kaffrine, Kaolack

AfDB

Mining railway extension and 12 MW solar plant, Zouérate

Mauritania

Netherlands (RVO)

ESIA of the Develop To Build (D2B) project, artisanal fisheries, six Casamance sites

Senegal, Casamance

See the full track record

05 · In the field

The field in pictures

Field photographs taken in Senegal and Mauritania. Faces have been deliberately blurred out of respect for the people we met.

06 · News

Latest news

Firm

The E2CS Consult website is live

The firm now has a bilingual site setting out its areas of expertise, its track record and its environmental and social toolkit. It is addressed as much to project management units as to…

Assignment

Port-hinterland corridors: E2CS on the environmental component

Within the A&A Strategy team, our expert is handling the environmental component of the logistics-flow diagnosis and the multimodal corridor master plan, carried out for the…

Training

Four FES training kits now available

FES-CLIMAT, FES-GES, FES-PESTES and FES-PISTES: four modular kits, each with a facilitator’s guide, a participant’s workbook, wall charts and a pre-test/post-test assessment framework.

All news

Frequently asked questions

What project owners ask us

When is an in-depth impact assessment required rather than an initial environmental analysis (AEI)?

The choice of instrument follows from screening: it depends on the nature of the project, the sensitivity of the receiving environment and the scale of expected impacts. In Senegal, the Environment Code (Law No. 2023-15 of 2 August 2023) and its implementing texts provide for four instruments, the initial environmental analysis (AEI), the in-depth environmental and social impact assessment (ESIA), the environmental audit and the strategic environmental assessment. Funders add their own classification, High, Substantial, Moderate or Low for the World Bank, categories 1, 2 or 3 for the AfDB (2023 ISS). We always run an upfront screening that tells you precisely which instrument is required, and why.

How long does an environmental and social impact assessment take?

For a medium-sized project, allow roughly two to four months from scoping to draft report, plus the time needed for administrative review and the public hearing. The determining factors are the size of the study area, the season (site access, ecological surveys), the number of stakeholders to consult and the availability of baseline data. You receive a detailed schedule with the scoping note.

Do you work outside Senegal?

Yes. Our assignments have covered Senegal, Mauritania, Guinea-Bissau, Cameroon and Belgium, as well as three transboundary basins (the Senegal River (OMVS), the Gambia (OMVG) and the Niger) within regional programmes that also covered Guinea, Mali and The Gambia. For each assignment we mobilise a network of associated experts (GIS specialists, socio-economists, ecologists, GBV specialists) suited to the country context.

Do you work to World Bank and AfDB standards?

That is our core business. We work fluently with the World Bank Environmental and Social Framework and its ten Environmental and Social Standards, the AfDB Integrated Safeguards System and its Operational Safeguards (to whose 2024 update our founder contributed) as well as the IFC Performance Standards and IFAD’s SECAP procedure. Every deliverable comes with a compliance grid documenting, standard by standard, how each requirement is addressed.

What happens after the report is delivered?

A study is only worth what its implementation is worth. We remain available for the administrative review of the file, facilitation of the public hearing, translation of the management plan into a contractor-level plan, training of project and contractor teams, and environmental and social supervision during works.

Next step

A project to appraise, to finance, or a team to train?

Describe what you need in a few lines. We come back with a first read of the issues at stake, the instrument required and a realistic schedule.