Consulting firm · Dakar, Senegal
Irrigated market garden scheme in operation

Track record & flagship projects

Thirty years of assignments, from national park to logistics corridor.

A selection of representative assignments led by the founder of E2CS Consult and his network of associated experts, grouped by sector and listed most recent first. Completion certificates available on request.

29 assignments shown

2026 — ongoingIstithmar West Africa (IWAFRICA), through EnviroTech

220 MW hybrid solar and wind power plant

Review of the Oued Lemsila Resettlement Action Plan, critical review of the plant’s ESIA, and environmental and social impact statement for the construction camp and the 2.2 km access track.

Role: Team leader · Area: Mauritania

Ongoing Private
Sept. — Oct. 2024SNIM, through EnviroTech

Mining railway extension and 12 MW solar plant, Zouérate

Environmental and social impact statement prepared under Operational Safeguards OS1 to OS10 of the AfDB Integrated Safeguards System: baseline, applicable framework, impacts and measures. Complemented by the Stakeholder Participation Plan and the compliance audit of the photovoltaic plant.

Role: Team leader · Area: Mauritania

AfDB
Nov. 2021 — March 2026Centre de Suivi Écologique · HM Logistique / AZ Services

ESIA of the Sékoto basalt quarry

Impact assessment of the basalt extraction site, led at the head of a multidisciplinary team — geologist, public participation, socio-economics, hazard study: biophysical and socio-economic baseline, institutional and legal framework, public consultation, impact and risk analysis and environmental and social management plan. Final report submitted in March 2026.

Role: Team leader · Area: Senegal — Tomboronkoto, Kédougou region

Private
March — July 2019Ministry of Energy, through ECO PROGRESSO

ESIA of the Alto Bandim floating thermal power plant

ESIA and management plan in an estuarine setting immediately adjacent to residential neighbourhoods: air and water discharges, noise, technological risk and the safety of nearby residents.

Role: Team leader · Area: Guinea-Bissau

World Bank
Feb. — March 2026Ministry of Industry and Trade

Stakeholder Engagement Plan, Centre Agropole (PZTA Centre)

Stakeholder mapping and analysis across four regions, with eight field enumerators deployed in pairs; engagement and information strategy, grievance mechanism, and a plan compliant with the Operational Safeguards of the Integrated Safeguards System.

Role: Individual consultant, team leader · Area: Senegal — Diourbel, Fatick, Kaffrine, Kaolack

AfDB
Nov. 2024 — March 2025PNDL / PNAR

ESIA for connecting private schemes to the Branch B drainage outfall — 26,465 ha

Detailed ESIA and management plan in a wetland of ecological importance: drainage canals, hydraulic structures, control of salinisation and waterlogging.

Role: Team leader · Area: Senegal — Senegal River delta

AfDB
April — May 2024Centre de Suivi Écologique, for the Ministry of Agriculture

Climate-smart ESMF and SECAP note, Food Security Support Programme (PASS)

Environmental, Social and Climate Management Framework and SECAP note for the programme, linking climate risk to the funder’s requirements.

Role: Environmental specialist · Area: Senegal

IFAD
Oct. — Nov. 2020Ministry of Industrial Development, through BRL Ingénierie

Update of the SESA and resettlement policy framework, South Agropole (PZTA Sud)

Update of the strategic environmental and social assessment and the Resettlement Policy Framework to incorporate the Green Climate Fund activities, addendum to the assessment, and Pest and Vector Management Plan.

Role: Team leader · Area: Senegal — Ziguinchor, Sédhiou, Kolda

AfDB
March — Sept. 2019Ministry of Industrial Development, through BRL Ingénierie

SESA and RPF/RAP for an agropole in Casamance

Strategic Environmental and Social Assessment, Resettlement Policy Framework and Resettlement Action Plan, within the technical, economic, financial, legal and organisational feasibility study.

Role: Expert in charge of the SESA and RPF/RAP · Area: Senegal — Casamance

UNIDO
March — July 2009SENAGROSOL – BRL Ingénierie consortium

Environmental assessment of the Podor hydraulic scheme

Five basins including Ngalenka, Podor and Wawa: analysis of environmental sensitivity and biological diversity, impact assessment and preparation of the environmental and social management plan.

Role: Associate expert · Area: Senegal — Podor

Millennium Challenge Account
Aug. 2026 — ongoingSenegalese Shippers’ Council (COSEC)

Port-hinterland corridor master plan — environmental component

Integration of environmental and sustainability issues into the logistics-flow diagnosis and the multimodal corridor master plan, with a focus on the climate resilience of infrastructure.

Role: Environmental expert · Area: Senegal

Ongoing Government
May — July 2026Ministry of Fisheries and Maritime Economy

ESIA of the Develop To Build (D2B) project — artisanal fisheries, six Casamance sites

ESIA compliant with the IFC Performance Standards, classification of the facilities under national regulations, management plan and annexes: sludge and waste management, GBV/SEA-SH prevention, grievance mechanism and stakeholder engagement plan.

Role: Team leader · Area: Senegal — Casamance

Netherlands (RVO)
Jan. — March 2026A&A Strategy

Preliminary appraisal of the Chavanel Market PPP, Pikine Ouest

Preliminary socio-economic and environmental appraisal, project notice filed with the national environmental authority, and identification of sustainability levers for the future market facility.

Role: Environmental specialist · Area: Senegal — Dakar

KfW
Dec. 2021 — presentMUCTAT

Casamance Economic Development Project (PDEC)

Coordination of the safeguard instruments under the Environmental and Social Framework (ESCP, ESMF, RPF, SEP, LMP, GRM): terms of reference, quality review, clearance and disclosure; integration of E&S clauses into bidding documents, protocols and contracts; reporting to the World Bank.

Role: Environmental safeguards specialist · Area: Senegal — Ziguinchor, Sédhiou, Kolda

Ongoing IDA / World Bank
2016-2017, then 2020 — presentMinistry of Posts and Telecommunications

Senegal Digital Technology Park (PTN)

Design and preparation of the ESIA and the hazard study, coordination of management-plan implementation, agreements and protocols with partners, QHSE supervision of contractors and monitoring of regulatory compliance for classified installations.

Role: Environmental and Social Safeguards Manager · Area: Senegal — Diamniadio

Ongoing AfDB
June 2017 — Sept. 2020PPDC project management unit

Casamance Development Pole Project (PPDC)

Coordination of the preparation and disclosure of the ESMF, RPF and Pest Management Plan; screening and categorisation of annual work-plan activities; drafting and clearance of terms of reference with the national and regional environmental directorates; coordination and capacity building of the executing agencies AGEROUTE and ANIDA.

Role: Environmental and social monitoring manager · Area: Senegal — Casamance

IDA / World Bank
Aug. 2026 — Jan. 2027OMVS, through the SCPS / TROPIS group

Environmental monitoring strategy for the Senegal River basin

Diagnosis of the state of the basin’s environment and biodiversity, thematic data collection strategy and a monitoring methodology adapted to climate change.

Role: Environmental expert · Area: Guinea, Mali, Mauritania, Senegal

Ongoing OMVS
Dec. 2025 — May 2026Centre de Suivi Écologique

ESMF of the Sine Dead Valleys Project

Nine municipalities and 7,000 ha: 30 risks and 27 impacts identified using the revised Fecteau method, a five-year management plan budgeted at 616 million FCFA, with gender and climate resilience mainstreamed throughout.

Role: Team leader · Area: Senegal — Fatick

Adaptation Fund
Feb. — June 2025Ministry of Environment, through TROPIS / CONCEPT

Mid-term review of the Marine Protected Areas policy project — mangroves

Analysis of the relevance, effectiveness, efficiency and sustainability of the interventions, with operational recommendations for the second phase.

Role: Environmental specialist · Area: Senegal — Casamance & Sine Saloum

AFD
May 2021 — July 2023OMVG, through BRL Ingénierie

Master plan for the Gambia, Kayanga/Geba and Koliba/Corubal basins

Diagnosis, analysis of the issues at stake, and contribution to the master plan on the environment, ecotourism and protected-area components of the three transboundary basins.

Role: Environment and ecotourism expert · Area: Gambia, Guinea, Guinea-Bissau, Senegal

UNCDF
Dec. 2021 — July 2022TROPIS Tropical Services

Strategic Environmental Assessment of mangrove restoration

Strategic Environmental Assessment of the mangrove ecosystem restoration programme.

Role: Team leader · Area: Senegal — Sine-Saloum & Casamance

WeForest
June — Aug. 2021Climate Finance Unit — Centre de Suivi Écologique

Preliminary appraisal of the Sine Dead Valleys climate resilience project

Preliminary environmental and social screening: characterisation of the climatic and ecological issues of the dead valleys, vulnerability analysis of the municipalities concerned, and identification of accompanying measures.

Role: Team leader · Area: Senegal — Fatick

Green Climate Fund
Dec. 2015 — May 2016Centre de Suivi Écologique

Climate Finance Unit — concept notes, project appraisal and portfolio monitoring

Preparation of climate project concept notes, technical appraisal of submitted files and portfolio monitoring within Senegal’s institution accredited to the climate funds. Includes the Dionewar diagnostic study (Adaptation Fund).

Role: Environmental specialist · Area: Senegal

Climate funds
April — July 2011BRL Ingénierie, for OMVG

Sambangalou hydroelectric scheme — impact on Niokolo Koba National Park

Establishment of the baseline for Niokolo Koba National Park — biodiversity, ecology, management, fauna, flora, tourism — and assessment of the dam’s impact on the park.

Role: Associate expert · Area: Senegal — Gambia River

AFD
July — Oct. 2000National Parks Directorate

Management plan for Niokolo Koba National Park and its periphery

Drafting of the management plan for the park and its buffer zone, thematic mapping and the “Fauna” section.

Role: Associate author · Area: Senegal — Tambacounda / Kédougou

FAC / FFEM
June — Oct. 2024African Development Bank

Country environmental and social systems assessment

Diagnosis of the policy, legal and regulatory framework and of institutional capacity; analysis of convergence and divergence with the Integrated Safeguards System; associated capacity-building plan.

Role: Team leader · Area: Mauritania

AfDB
2024African Development Bank

Contribution to the update of the Integrated Safeguards System (ISS)

Participation in the work to update the Integrated Safeguards System of the African Development Bank Group.

Role: Contributor · Area: Bank Group

AfDB
Sept. — Dec. 2016PRSPDA project, through SONED-Afrique

SESA of the Private Sector Rehabilitation and Agribusiness Development Project

Analysis of the impacts and risks of the cashew value chain end to end, assessment of the policy, legal and institutional framework, and preparation of the ESMF and a cashew sector diagnostic report.

Role: Team leader · Area: Guinea-Bissau

World Bank
Dec. 2016 — May 2017Ministry of Economy and Finance — Planning Directorate

Feasibility studies for the PADAPS and PAGERN projects

Design of two projects for communities bordering Niokolo Koba, Djoudj and Saloum Delta national parks, and the Casamance, groundnut basin and Senegal River valley watersheds: environmental, social, technical and economic feasibility.

Role: Expert team leader · Area: Senegal

Government

Sectors covered

Where our assignments have taken us

Renewable energy & thermal generation Mining & rail infrastructure Agribusiness & agropoles Agricultural hydraulics & rice schemes Artisanal fisheries Road, urban & market infrastructure Port logistics & corridors Protected areas, wetlands & mangroves Community forestry Digital & technology parks

Countries and basins

Five countries of direct assignment, three transboundary river basins, and regional programmes also covering Guinea, Mali and The Gambia.

Senegal Mauritania Guinea-Bissau Cameroon Belgium Senegal River basin — OMVS Gambia River basin — OMVG Niger basin

In the field

Assignment photographs

Pictures taken during our assignments. Faces have been blurred out of respect for the people we met.

Evidence & documents

The full dossier is available on request.

Completion certificates, non-confidential reports, funder-format CV (Form TECH-6), institutional brochure, trade register and tax identification: the complete administrative and technical dossier is available for your tender submissions.

Request our reference dossier

Next step

Your project deserves the same rigour.

Tell us about your programme: we will point to the comparable assignments we have led and the team we would mobilise.